Project Summary
The project consists of the construction of a new 143 on grade car parking below the new hockey turf level. Anew Hockey Field with hydro-turf was constructed over a concrete structure with hollow core deck and concrete topping slab. This Hockey Field includes dug-outs, heating, fencing and lighting.
Adjacent to the Hockey Field is the new Music Suites and Classrooms facility on the north east side of the carpark level. A new single storey building, which includes 7 music practice suites, 4 music classrooms, a music lounge and stage area, storage office and WCs.